Why New Construction?
Many homeowners’ dream of a newly built home built by a local home builder because of all the great options that it offers. First off your new construction home can be designed the way you want it. This allows you to choose the floor plan and room layout including sizes to fit exactly how you want to live. When completed you will get that new home feel where you’re the first person to ever hang a picture or the scent of freshly built home building materials. There are so many more reasons to build a new construction home especially when the price is similar to an older home.
In today’s modern time of manufacturing and development you’ll get improved low maintenance building materials that can last a lifetime. Then you have the safety aspect of today’s new construction using more advanced engineered and design methods. Below is a short list of just many related items that you can read in detail about in our Building Resource library;
- Indoor Air Quality
- Hurricane Proof with Fortified Building
- Maintenance Free Building Products
- Homeownership Cost Savings with new construction
- Lower Your Insurance bills
- Lower Your utility bills
- Zero Energy Homes
- New Construction Better Floor plan Designs
- And much more!
New Construction Cost Per Square Feet.
So what can you expect to pay? The most common question that is asked is how much per square feet. This is like asking to buy a car by the pound. Price per square feet is so subjective to things like bedrooms cost compared to kitchen cost or is the garage and covered porch included in the price. In fact you can have the same total square footage house plan for two different designs and their cost could easily be $60 or more different in the Square foot price.
New construction house prices as noted above will be very similar to existing home prices if they were compared apples to apples. The bank appraiser and tax assessor is going to value a new construction home compared to what other local area homes sold for even if it’s newly built. Home builders aren’t going to sell homes higher than a bank would approve, but existing built homes love to keep up with today’s sold prices.
How long does it take to build a home?
Generally speaking the process to build never starts until the building permit is issued. This signifies that the home builder can now move forward. So this is a two part question, Pre-construction and actual construction.
Pre-Construction list of items and estimated time frames that the builder has no control of:
Consumer interviewing and picking a Home Builder – 30 Days.- Choosing a house plan. – 15 Days.
- Architect adjusting the plan and matching building lot info. – 30 Days.
- Bank / Appraiser reviewing completed plan and approving loan. – 45 Days.
- Building Department plan review. – 30 to 60 Days.
Actual Construction task is listed below in the Building Process section but the overall time frame often can range from 12 months to 18 months. Depending on weather, home design and building systems it is possible to compete a well-built home in 6 to 9 months. One of the biggest reasons for longer time lines is the building inspection process; unlike most states Florida has a very detailed inspection list. This is often to your benefits as in some states they might have only four inspections for the complete home which could allow poor workmanship to never be seen. In Florida it’s not uncommon to have twenty five or more inspections. The lengthen time frame comes when a contractor has to pack up his job and wait to come back to finish after the local building inspector has a chance to review his partial work. Just one example could be the drywaller has to have a screw inspection before starting to mud the drywall joints.
How to choose the right home builder.
First off make sure you get to met with several builders so you can better understand how each one works. Some might take the approach of pushing you into a special deal if you sign today and others will be there to help explain every step and be on your side to help and confirm you’re making the right choices. This interviewing process is the best tell-tell sign to know who you might be working with for the next several months. During this interviewing process make sure to ask good question, below is example of some;
- How Long have you been building?
- How often do you change sub-contractors?
- Do you have a warranty?
- Do you have an office location?
- Are you licensed and insured?
- Do you have a sample building contract I can have?
- What banks have you done new construction loans with?
- Do you sub-contract large sections of task or individual items?
- How do you feel your pricing structural is compared to the market?
Once you have completed this interviewing process and ask simple questions you can easily tell who you are more comfortable with. The single most important follow up is contacting the new construction lending bank and confirming that they would approve them for building. Each new construction lender will also do a complete background check and confirm they are willing to share in the risk of building with your chosen builder.
New Construction loans
Stock House Plans or Custom House Plans
Using stock house plans will often offer a consumer a better idea quickly on what type of home can fit on their building lot and price range. These stock plans have often been built several times and the fine tuning of making a perfect house has been perfected. Each plan has been design to maximize the use of building materials offering more home for the money and less in the dumpster. In addition every sub-contracted service like plumbing, air conditioning and electrical systems have been well thought out and planned for efficiency and value. Stock house plans are by far the best choice for many homeowners as they still offer some minor customization.
Custom house plans are very unique because either the building lot shape or the consumer’s individual needs. I Custom house plan can start from scratch or using ideas from several features of other homes the homeowner has fell in love with. In some cases the house can be so unique that even a standard building contract would have major modifications to cover the unique plan. Custom home plans can use materials and or complete systems very efficient or inefficient all depending on the issues of each plan’s limitations. The cost of custom homes can vary greatly from just the types of materials, special design characteristics and even managing the job.
New Construction Building Contract
A standard building contract will often cover building material details and will have a fixed price. In this fixed price contract you might see zero to just a few items labeled as allowances. These allowance items are because that exact item is unknown in enough detail to give the exact price. The allowance is a guess of the item and the homeowner will pay the difference of when the actual cost is known. The less allowance items listed on your contract the better protected you are to stay in budget. A cost plus contract is not as common and only found in unique homes. A cost plus contract really protects the home builder to cover his cost as the homeowner can choose anything they could dream about. A cost plus building contract is really like having the whole house as a allowance with a guarantee that the builder will make his portion. The cost plus contract is very rarely the best option for homeowners and often the construction lending banks will not except this for their loan approval.
Picking the Perfect Building Lot
When building a new construction home if you don’t already have a building lot then let’s start looking. First off you need a good real estate agent or home builder that is familiar with the new construction building process, the last thing you want to do is buy a lot that can’t be built on. Besides the normal items most would consider like location to shopping, hospitals, schools and so on a new construction building lot also has unique concerns.
What are the setbacks and lot restrictions? Each municipality will have limits on how close to the side yards and front /rear you can build. These limitations can also include maximum heights, zoning requirements and many more.- Will there be more lot prep expenses? Lots with trees, structures, hills or dips in the land all have additional cost to prepare the lot for a new structure, in addition some obstacles like existing homes, underground service utility pump systems and certain trees may not even be allowed to remove.
- Is the Building lot in a flood zone? Building homes in flood zone area require extra insurance and must meet flood zone special building requirements which require elevating your home as a minimum.
- Public service utilities. Does your lot have access to electrical grid system, sewer plumbing system and fresh water supply? Each of these services can cost you thousands to get them to your lot or even make the lot unbuildable.
- Unknown extra lot cost. Florida has impact fees that are charged for every home that is built; these fees cover items like lot owners portion of the original service structural of the local services. Things like Fire station, transportation, sewer water and others could add ten thousand or more in cost when the building permit is issued. But in some cases if a home was once located on this lot before, these cost could be much less or even no cost.
Designing your perfect new construction home
If your new construction home design takes you down a stock house plan path no worries you’ll still have hundreds of choices to make. Things like types of exterior and interior finishes, system upgrades, expanding square footage of home and so many more.
Building a Strong Safe Fortified New Construction Home.
Building Energy Efficient or Net Zero homes
The Building Process
- Building Lot Prep and Foundation
- Rough Framing House
- Rough HVAC, Plumbing and Electrical
- Install Insulation
- Drywall & Painting inside
- Stucco, Painting and concrete driveways outside
- Install flooring, cabinets and countertops
- Finish trim, Plumbing, lighting